• ISSN: 2010-0248 (Print)
    • Abbreviated Title: Int. J. Innov.  Manag. Technol.
    • Frequency: Quarterly
    • DOI: 10.18178/IJIMT
    • Editor-in-Chief: Prof. Jin Wang
    • Managing Editor: Ms. Nancy Y. Liu
    • Abstracting/ Indexing: Google Scholar, CNKI, Ulrich's Periodicals Directory,  Crossref, Electronic Journals Library.
    • E-mail: editor@ijimt.org

    • Article Processing Charge: 500 USD
IJIMT 2011 Vol.2(6): 441-446 ISSN: 2010-0248
DOI: 10.7763/IJIMT.2011.V2.173

Key Relationship Oriented Indicators of Team Integration in Construction Projects

C. K. I. Ibrahim, S. B. Costello, and S. Wilkinson

Abstract—This paper conducts a review of the literature to identify key practice indicators of team integration in construction projects. The review identified eight key relationship indicators which can be considered vital to team integration within construction projects. These indicators can be used for measuring team relationship practice in construction projects and, hence, assist in improving a team’s competitiveness and effectiveness.

Index Terms—Construction projects, Key practice indicators, Relationship, Team integration.

Authors are with the Department of Civil and Environmental Engineering,The University of Auckland, New Zealand (e-mail:cche365@aucklanduni.ac.nz, s.costello@auckland.ac.nz, s.wilkinson@auckland.ac.nz).

[PDF]

Cite: C. K. I. Ibrahim, S. B. Costello, and S. Wilkinson, "Key Relationship Oriented Indicators of Team Integration in Construction Projects," International Journal of Innovation, Management and Technology vol. 2, no. 6, pp. 441-446, 2011.

Copyright © 2010-2024. International Journal of Innovation, Management and Technology. All rights reserved.
E-mail: ijimt@ejournal.net
Published by International Association of Computer Science and Information Technology (IACSIT Press)